Property development looks simple from the outside: buy land, build houses, sell them. In practice, most of the risk is created long before the first brick is laid — in the feasibility numbers, the planning assumptions, and the contract that ties the programme together. This guide is a practical sequence for small and medium residential projects, written for people who want to understand where the real risks sit.

Feasibility before drawings

Start with the numbers, not the design. A simple residual appraisal is enough for an early view: gross development value, build cost, professional fees, finance, planning contributions, and a contingency. Subtract the costs from the value and you have the residual — the amount available for the site.

Be honest about the inputs. Build costs are usually higher than the first quote, finance takes longer than expected, and sales values should be based on comparable evidence rather than hope. Run three scenarios: base case, a ten per cent cost overrun, and a ten per cent fall in value. If the scheme only works in the best case, it does not work.

Planning and consents

Check the local plan, the conservation area, flood risk, and any Article 4 directions before you commit. A pre-application meeting with the local authority is often the cheapest advice you can buy. Ask specifically what the officers would expect in terms of scale, parking, landscaping, and affordable housing.

Do not treat planning permission as the finish line. You may also need building regulations approval, party wall agreements, highways consent, drainage consent, and a construction management plan. Each has its own timetable, and some can hold up the start on site.

Finance and cash flow

Development finance is usually released against stages, not against the programme you hoped for. Model the cash flow month by month, including the period before planning, the build, the sales window, and the retention. Keep a contingency of at least ten per cent and a separate allowance for professional fees.

If you are using a joint venture or investor money, agree the decision rights early: who approves the contractor, who signs variations, and what happens if sales are slower than planned. A clear shareholders' agreement is cheaper than a dispute.

Build the right design team

You need an architect or designer, a structural engineer, a planning consultant where the site is complicated, and a principal designer for health and safety. Ask for examples of projects of similar size and complexity, and speak to the contractors who built them.

Coordinate the design before tendering. A tender based on incomplete drawings produces a low price and a long list of variations. Pay for coordination now; it is cheaper than discovering a clash on site.

Choose a contractor on more than price

Get at least three tenders with the same scope and the same drawings. Check the contractor's insurance, references, and recent accounts. Visit a live site and a completed project. Ask how they handle variations, delays, and defects.

The cheapest tender is often the one that has missed the most. Compare the exclusions and the provisional sums, not just the total. Agree a contract with a clear scope, a programme, payment terms, retention, and a defects period. A written contract protects both sides.

Programme and sequencing

Build the programme from the trades up, not from the completion date backwards. Allow realistic time for utilities connections, inspections, and the sales period. Identify the critical path and the items with long lead times: kitchens, windows, steels, and specialist glazing.

Weather, supply delays, and changes are normal. Keep a float of several weeks and review the programme every fortnight. A project that is two weeks late in month one is easier to recover than one that is two months late at handover.

Sustainability that pays back

Insulation, airtightness, ventilation, and good glazing reduce running costs and improve comfort. Solar panels can be a sensible addition on the right roof, but the structure, orientation, and connection need to be planned early. Check the structural and electrical requirements for solar panels before the roof design is fixed, not after the tiles are on.

Avoid adding technology for its own sake. A simple, well-insulated building with straightforward controls is easier to maintain and easier to sell than a complex system nobody can explain.

Inspections and quality

Inspect the work at each stage, not only at the end. Photograph the structure, services, and drainage before they are covered. Keep a snagging list as you go and review it weekly with the site manager. Independent inspections at foundation, frame, and pre-plaster stages are worth the cost.

For structural alterations, our guide to beams, load paths, and renovation sequencing explains why the order of work matters as much as the final drawing.

Handover and aftercare

Before completion, collect the building regulations certificates, warranties, as-built drawings, and operating manuals. Demonstrate the heating, ventilation, and alarms to the buyer or tenant. Leave a labelled folder and a contact for defects.

Keep a retention and a defects period in the contract. Respond quickly to the first few issues; they set the tone for the relationship and protect the reputation of the scheme.

Common mistakes

  • Buying a site before checking the planning history and flood risk.
  • Using a build cost from a different part of the country or a different year.
  • Tendering on incomplete drawings.
  • Choosing a contractor on price alone.
  • Leaving utilities and connections to the last minute.
  • Spending the contingency on upgrades before the roof is on.
  • Underestimating the sales period and the cost of holding the site.

Development is a discipline of assumptions. Write them down, test them, and update them as the project moves. The scheme that survives a bad month is the one that was priced for one.